Installation Process Of Sliding Doors
Oct 18, 2022| Construction preparation
Technical preparation: The drawings have passed joint review, and the positions and dimensions of the door and window openings match the construction drawings. Technical disclosure work has been carried out according to the construction requirements.
Material preparation: The material variety, type, specification, size, opening direction, installation position, and anti-corrosion treatment of the sliding door should meet the design requirements. Main accessories and materials: various hardware such as edges, grooves, pulleys, etc. must meet the design requirements.
Operating conditions: Before installation, check the door frame and leaves for any warping, paint peeling, hard injuries, etc. If any, they should be treated.
construction technology
Installation of edge strips: After the main structure is completed and accepted, check the hole size and measure the minimum of three points. Draw a+50cm position line on the door frame according to its installation elevation, in order to correct the levelness of the door frame during installation. Use a plumb bob to correct the verticality of the front and side of the frame, and use a level ruler to correct the levelness of the riser.
Installation of finished door: Install the finished door and test whether it is pushed smoothly. If the effect is not good, adjust the bottom pulley of the sliding door to make it push and pull freely.